Project Outcomes
- $72,000 in first cost savings and $119,560 in utility bill lifetime savings
- 14% reduction in HVAC energy consumption, 18% reduction in HVAC peak demand
- ASHRAE-compliant Indoor Air Quality
Project Goals:
- Reduce Life Cycle Costs
- Increase Energy Efficiency
- Improve Indoor Air Quality
- enVerid Project Details
- Location: Magnolia, AR
- Owner: Magnolia School District
- Contractor: Ideal Construction
- MEP: HSA Engineering
- Manufacturer Rep: Airetech
- Year Installed: 2020
- Project Type: New Construction
- Floor Area: 17,746 ft2
- HLR Modules: 2 Indoor