Project Outcomes

  • $64,580 in utility bill lifetime savings
  • 9% reduction in HVAC energy consumption, 12% reduction in HVAC peak demand

Project Goals:

  • Reduce Life Cycle Costs
  • Increase Energy Efficiency
  • enVerid Project Details
  • Location: Washington, DC
  • Owner: District of Columbia Public Schools
  • MEP: Design America Engineering
  • Manufacturer Rep: Havtech
  • Year Installed: 2020
  • Project Type: Retrofit
  • Floor Area: 7,941ft2
  • HLR Modules: 3 Rooftop
  • Project Partners