Project Outcomes
- $64,580 in utility bill lifetime savings
- 9% reduction in HVAC energy consumption, 12% reduction in HVAC peak demand
Project Goals:
- Reduce Life Cycle Costs
- Increase Energy Efficiency
- enVerid Project Details
- Location: Washington, DC
- Owner: District of Columbia Public Schools
- MEP: Design America Engineering
- Manufacturer Rep: Havtech
- Year Installed: 2020
- Project Type: Retrofit
- Floor Area: 7,941ft2
- HLR Modules: 3 Rooftop
- Project Partners